内控预算表 附件1建设单位:建筑面积:序号1234567架管扣件木板跳板彩条布防火油布304不锈钢方通铝板红丹防锈漆分解项目计算单位tt块块张卷tt桶桶tttttttm2块t台LLt1000匹元元元元元元元元35=38*0.02元元 9,993,441.60 219,926.36材料数量60.0015.002250.001260.00320.0080.0048.0018.0050.0050.0035.0018.0040.0030.008.0030.007.00396.00600.002.005.004850.001230.00800.001.0086232.006000000.0021000.00单价雅砻江流域开发有限公司 工程地点四川西昌锦屏二级水电站 清单中标总价:10996318.00 金额备注3300.00 198,000.003600.00 ,000.0085.00 191,250.00140.00 176,400.0085.00 27,200.00400.00 32,000.0016000.00 768,000.0018000.00 324,000.00120.00 6,000.00150.00 7,500.0016000.00 560,000.0010000.00 180,000.00800.00 32,000.00650.00 19,500.005600.00 44,800.008000.00 240,000.0025000.00 175,000.00460.00 182,160.0065.00 39,000.007720.00 15,440.005000.00 25,000.005.67 27,499.506. 8,044.203.00 2,400.001200.00 1,200.0086232.006000000.0021000.00 9,815.90预估600万元,已经产生人工费4631062元。10银光漆11内墙乳胶漆面漆12乳胶漆封闭底漆13腻子粉14石膏15真石漆封闭底漆16真石漆17真石漆罩面漆18防静电地板19耐磨地砖20螺纹钢&2021吸尘器22柴油23汽油24水泥25页岩标砖26其它零星材料27人工费28机械费29管理费(按2000定额含现24=41*0.05场及企业管理费)支出30其他措施费用31暂列金额33暂估金额34其他部分合计35安全文明施工费36规费 内控预算表 附件1建设单位:建筑面积:序号37税金38清单中标总价39材料总价40内控预算总价41项目经理确认签字:42内控预算员签字:分解项目计算单位元元元元10996318.0010213367.9610213367.96材料数量单价雅砻江流域开发有限公司 工程地点四川西昌锦屏二级水电站 清单中标总价:10996318.00 金额备注